導航:首頁 > 裝置知識 > 自動化裝置英文說明書

自動化裝置英文說明書

發布時間:2021-11-15 18:18:33

① 求一篇關於自動化的英語文章和翻譯 翻譯在3000字左右 謝謝

Electric Automation 電氣自動化

ELECTRIC AUTOMATION DEVICE AND METHOD FOR ADJUSTING THE FUNCTIONS OF THE ELECTRIC AUTOMATION DEVICE
The invention relates to an electric automation device comprising a control unit that is controlled by a computer. In order to create an automation device that can be set to predefined functions in a particularly flexible manner while requiring less testing, a computer hardware component (2) is provided with control software comprising a basic functional area which includes an operating system (3), a device driver (4), and communication moles (5) so as to form a basic automation device (1) while the basic automation device (1) is complemented with any application moles (7a, 7b, 7c, 8, 9) that can be connected to the basic functional area via a software interface (6) in order to obtain the automation device. The invention also relates to a method for procing or adjusting the functions of such an electric automation device.

電氣自動化專業介紹

一、專業概況
隨著高新技術的發展和生產自動化程度的提高,我國國民經濟發展,正在和繼續需要大批技術應用型實用人才。電氣自動化技術是現代製造技術中不可缺少的重要技術門類,也是一個國家科技實力乃至綜合競爭力的綜合反映,在工業發展中具有前導地位。電氣自動化技術,集機、電、計算機、信息處理等多學科於一體,是多學科相互交叉、滲透、結系淖酆涎Э疲?詮?窬?媒ㄉ柚姓加兄匾?牡匚弧R虼耍?梢運檔縉?遠??際跏嵌ヌ熗⒌氐氖亂擔?槍?窬?梅⒄購腿嗣襠?釧?教岣叩奈鎦侍跫?? ?br>
(一)、培養目標本專業培養德、智、體、美、勞全面發展,具有良好職業道德和綜合業務素質,具備較強的創新意識和創業能力,掌握電氣自動化技術、計算機控制技術的基礎理論,能在生產、建設、管理、服務第一線從事常用電氣自動化設備、常用電氣設備、供配電系統和裝置、計算機控制系統、PLC控制系統的安裝、調試、運行和維護的實用型高技能專門人才。

(二)、培養要求及職業能力分析

1、培養要求:本專業主要學習電氣自動化的專業技術知識,應具有較強的本專業技術應用能力。
2、職業能力分析
(1)具有良好的身體素質、職業道德和人文素質,較強的語言文字表達能力和一定的社會交往能力及繼續學習能力。
(2)具有較強的用英語進行人際和人機交流能力,具有閱讀和翻譯本專業有關英文資料的能力。
(3)具有較強的在信息化社會中工作、學習、生活所必備的計算機應用能力;熟練使用電子電氣CAD軟體;掌握一門程序設計語言。
(4)具有分析和測試常見的電工電子線路,能設計一般電工電子應用線路,能熟練使用常規電工電子儀器、儀表,具有熟練的電工基本操作技能。
(5)熟悉常用低壓電器的基本原理及使用;能熟練閱讀電氣控制線路的原理圖與接線圖;具有對常規電氣設備、供配電設備等電氣控制系統進行安裝、調試、維護能力。
(6)具有正確選用、安裝、調試、維護電力電子裝置和典型交、直流調速系統的能力。
(7)具有熟練的可編程式控制制器應用能力。
(8)具有以嵌入式計算機數字控制技術為核心的新技術基本應用能力,對相應控制系統具有調試維護能力。
(9)具有對一般的機械零件圖、產品裝配圖與機械、液壓和氣壓傳動系統迴路的識讀能力,了解常用機械設備的結構特點及工藝過程,了解常見的機械和電氣的配合關系。
(10)了解企業管理的基本知識,具有一定的質量意識。

(三)、課程設置

課程設置共分五部分:公共必修課、專業必修課、專業限定選修課、專業選修課及公共選修課。

1、公共必修課包括:思想道德修養、法律基礎、鄧小平理論、馬克思主義哲學、體育、英語、高等數學、計算機操作基礎等。
2、專業必修課包括:電工基礎、模擬電子技術、數字電子技術、電機及拖動基礎、機械制圖及公差、機械工程基礎、嵌入式計算機原理及應用、C語言程序設計、自動檢測與轉換技術、現代電力電子技術、可編程序控制器應用、自動控制原理與系統、C語言、工廠電氣控制技術、電子電氣CAD、變配電技術、變頻調速原理與應用、工業控制網路、DSP原理與應用及專業英語等。其中主幹課程為:電工基礎、模擬電子技術、數字電子技術、電機及拖動基礎、嵌入式計算機原理及應用、自動檢測與轉換技術、現代電力電子技術、可編程序控制器應用、自動控制原理與系統等。
3、專業限選課包括:計算機控制技術、工業自動化儀表、控制電機、智能控制等。
4專業任選課包括:電工電子工藝、多媒體技術、樓宇自動化、計算機系統模擬、計算機維修、程序設計(VB)等。
5、公共選修課包括:包括兩個能力模塊:經濟管理科學類和人文與社會科學類。

(四)、實踐教學環節

1、專業主要實踐教學包括:電工實驗、模擬電子技術實驗、數字電子技術實驗、電機與電力拖動實驗、可編程序控制器應用實驗、嵌入式計算機原理實驗、現代電力電子技術實驗、電工基礎課程設計、電子技術課程設計、嵌入式計算機原理課程設計、可編程序控制器應用課程設計、自控系統課程設計、綜合系統實訓、金工實習、電工電子實習、專業參觀、綜合生產實習、畢業設計等。
2、非專業實踐教學包括:入學教育、軍訓、暑期社會實踐、社團活動、體育活動、文藝活動等。

(五)、職業技能證書

本專業證書包含三個方面:

1、公共必修證書:PET、計算機一級證書。
2、專業必修證書:CAD初級、維修電工中級。
3、任選證書:CET四級證書、計算機三級證書(單片機方向)、CAD中級證書、維修電工高級證書、氣液電控制技術。

(六)、本專業師資力量

學院擁有一支學術造詣高、教學經驗豐富、實踐能力強的師資隊伍。電氣自動化技術專業現有師資26人,其中副高職稱以上有17人,「雙師型」教師10人。能夠滿足公共基礎課、專業基礎課和專業課的理論及實踐教學的需要。

二、職業前景

1、對口行業

電氣自動化技術是傳統而具有新內涵的專業,本專業培養擁護黨的基本路線,德、智、體、美等全面發展,具備從事電氣自動化技術所需要的理論知識和職業技術能力,主要在生產、建設、服務和管理等第一線工作的高級技術應用性專門人才。本專業的畢業生可就職於國防、航天、航空、航海、鐵道、機械、輕工、化工、電子、電力、電信、鋼鐵、石油、礦山、煤炭、地質、勘測等廣泛的工業、農業、科學研究領域,也可就職於現代物流及現代服務業。

2、就業前景

在上海市經濟委員會的《上海製造業戰略升級的行動綱要》中指出:加快推動製造業的戰略升級是貫徹黨的十六大精神,堅定地走新型工業化道路,實現向製造業強國轉變的國家戰略需要,也是上海建立新型產業體系,提高城市綜合競爭力,堅持「四個中心」的客觀要求。上海製造業戰略升級的重點包括:高新技術產業重點發展電子信息和現代生物與現代醫葯製造業;交通運輸設備製造業重點發展汽車、軌道交通、船舶、民用飛機;裝備製造業重點發展大型成套設備、電站設備、新能源和新型環保設備製造業;原材料製造業重點發展石油化工和精細化工、精品鋼材製造業;生產性服務業重點發展製造業物流、技術服務等產業;大力發展就業廣、清潔型的都市型工業。根據電氣自動化的內涵,上述產業無不包含電氣自動化技術,同時也對電氣自動化技術專業的人才提出了更高的要求。據上海市政府組織的《面向新世紀上海緊缺人才需求趨勢與開發研究對策》的報告顯示,復合型技術人才是緊缺的專業人才,而電氣自動化技術專業是培養復合型技術人才的有效載體。可以預見在未來數年內,電氣自動化專業畢業生就業前景良好。

② 您知道怎麼寫自動化設備組裝機的說明書,有模板嗎

根據設備的總裝圖,先拆份組件,在按照組件拆份零件,精確到螺絲螺母。根據先後順序配上說明文字。並且寫明每一步需要做的要求以及安裝時的注意事項。圖文並茂是必須的,不能指望每個安裝的人員都是能看懂文字說明的,有圖才有真相。

③ 誰有德國西門子的機器的英文說明書啊!小弟跪求!最好能附帶一份中文翻譯。

但是自2004年之後,這一現象開始逆轉。

由那年開始,民工荒從珠三角、長三角一路蔓延,甚至作為大量勞力輸出源頭的中部大省,也出現了民工荒。

供需關系變化,讓中國工人的價格則日漸上漲,與十年前相比已經翻了將近三番。

與此同時,隨著國產技術的進步,機器的價格卻開始跌落。現在,一台國產電腦橫織機,價格一般在8萬-15萬元之間,不到進口機的1/4,且維修成本大大低於進口設備。如果按照每天200元-250元的平均日產值來算,一般1-2年可以收回成本。

更重要的是,即使企業老闆有辦法能讓車間里塞滿上世紀80年代後出生的年輕面孔,他們依然會發現,這一代農民工已經與上一代有了太大的不同。

他們不再對加班任勞任怨,喜歡去網吧甚過賺工錢。他們甚至不願意住企業免費提供的集體宿舍,理由僅僅是管理太死板。而他們的父母,對這些在計劃生育政策下成長起來的獨生子女們也更加寵愛,只要他們打個電話說聲辛苦,就讓其回家。

今年上半年,富士康13連跳和本田罷工事件,讓外界第一次意識到這個群體的變化。中國企業主們被迫用加薪來安撫他們的情緒。在過去的幾個月間,富士康的薪酬提高了60%多,而廣東、浙江甚至北京、天津等地都紛紛上調了最低工資標准。

「打工仔已經不再是以前的打工仔了」,這些80後90後的工人,讓已經做了十多年二手設備生意的代永,頭一回看到機器賣得這么火。他給記者講述了剛剛發生的一個故事:東莞一位企業主,中午12:30召集組長開會通知晚上加班;15:30將通知貼到員工宿舍,但到了晚上竟然沒有一個人來。一怒之下,這位老闆找他買了三台插件機。

■ 當工廠套上固定資產的枷鎖,能否倒逼出真正的技術與價值鏈上的轉型升級,尚有待觀察

一切剛剛開始

「我們現在的機器,只相當於西方上世紀80年代的水平。」代永毫不客氣地說。

改革開放以來中國經濟的高速增長,實際上是享受了計劃生育政策實施前10年內人口大幅增長帶來的「紅利」,從1978年到1998年,在中國持續20年的經濟高速增長中,資本的貢獻率為28%,技術進步和效率提升的貢獻率為3%,其餘全部是勞動力的貢獻。

但這樣的紅利已難以持續。早在幾年前,中國社科院人口與勞動經濟研究所所長蔡昉等人就提出:中國從20世紀60年代中期進入的「人口紅利期」,2015年前後將宣告結束。

其實這樣的歷程,上世紀70年代的日本曾經歷過,並由此進入一個技術飛速進步的工業化時代。

上世紀50年代,日本的戰後經濟起飛同樣主要靠的是廉價、肯干、守紀律的勞動力。但上世紀60年代初,日本主動放棄這一優勢,尋求高工資、高福利和高勞動生產率的發展戰略。結果,日本的機器人使用率為全世界之最。

中國去年超越日本,成為僅次於美國的第二大工業製成品生產國,但工業化水平卻難以望其項背。「我們現在的機器,只相當於西方上世紀80年代的水平。」代永毫不客氣地說。

野村證券提供的數據顯示,今年3-5月,中國工廠使用數控系統的機械設備比例——該比例是衡量自動化水平的通用指標——升至27%,比前兩年都要高。

但這一水平僅僅與日本上世紀80年代相當——目前,日本工廠數控比例已升至82%的全球領先水平。

與西方相比,有著龐大廉價勞動力的中國,機器化進程緩慢得多。

在代永的印象中,珠三角勞動密集型行業上一次出現使用機器熱是在2000年左右。彼時,他和他的夥伴們——主要是進口機器的維修人員——一起,從進口的電子垃圾中淘出已經報廢的機器,修修補補作為二手機賣出去,價格比進口的便宜一大半。

二手「電子垃圾」的生意一直持續了十年。當這個行業里終於出現了國產設備生產商,代永在今年春節後便轉投過去。他說,「隨著勞動力價格的上漲,機械化和自動化,將會是一個不可逆轉的趨勢。」(作者: 陳新焱 實習生 彭芸)

④ 求儀表自動化專業英語比較好的人 幫我翻譯一份閥門定位器的說明書

這幾天天天一日遊了。沒有時間。
既然能網路,單詞不成問題啊。慢慢看吧。這樣印象深。

⑤ 自動化專業英語翻譯

生物質是一種可再生能源的能源來源,因為它包含來自Sun.Through光合作用的過程中,植物中的葉綠素捕捉太陽的能量轉化的二氧化碳的空氣和水從地面到「碳水化合物」 ,復雜的化合物組成碳,氫, oxygen.When這些碳水化合物被燒毀,他們回頭到二氧化碳和水,並釋放太陽的能量,他們contain.In這樣,生物質的職能作為一種自然儲存太陽能。
圍繞可再生能源
一個主要的原因,使用可再生能源仍然是相對有限的是它的成本相比,化石燃料發電。 (政府資金到位的情況下,以個人誰熱衷於使用和安裝可再生能源系統。 )
但是,改進的技術,近年來,取得了風力發電和生物能源,經濟上比較competitive.Although的費用,一些太陽能設計仍然相當高,它是不可能的countires如英國,可靠的陽光,將投資大量資金進入這一資源develping短期內的未來。
此外,可再生能源系統,往往可以在當地侵入和許多人反對把大量的風力渦輪機等佔領農村
盡管存在這些障礙,但是,可再生能源的長期可能有一個安全的未來,並將繼續提供越來越多的世界能源需求,同時擔心氣候影響的化石燃料發電依然存在。
你能做什麼呢?
有許多選擇curently開放給業主關於可再生能源的使用sources.Various計劃,詳情如下,可以被納入大多數家庭系統,可用於與傳統的暖氣和電力systems.The各種方案包括:如下:
地源熱泵(地源熱泵)在地源熱泵系統的循環液體通過專門設計的線圈或循環管道埋在地下。液體吸熱從year.A熱泵刪除儲存能源和轉移到一個系統的暖氣建設和熱水需求。
這些裝置的最佳結合,這是地板供暖系統,但可與其他可再生options.Whilst不嚴格,每一個單位所需的電能功率泵生產三至四年的單位能源提取地面。
太陽能光伏(太陽能)這涉及發電從Sun的energy.It工程最好的陽光直射,而且也是effsctive條件下多雲。面板或光電一體化產品,最好設在40度的南角15-16度之間。光伏系統可改裝到現有建築物或納入現有的和新的建築。
具體的例子rearons和支持你的答案。

⑥ 請幫忙翻譯一份自動化元件的證明書,要精確 快速

ZLK type non-contact master control switch
I. OVERVIEW
ZLX-type non-contact switch as a master control automation group Hydrogenerator turbine components to reflect I. Kai-Qi Ye degrees and in different locations opening of the output signal corresponding contact.
Magnetic memory from the device and the magnetic switch contact group composed of two magnetic contact with the guide pole relay, magnetic memory installed in the switch group relay rack (see figure). I. Kai-Qi Ye of changes in the relay with a head-rod movement together. Head end of the switch and memory group stainless steel casing to maintain 2-6 mm distance between the parallel movement. When the head near a mobile memory switch, the switch contact sent signals, and contact memory moves down. Each switch are a regular set, a normally closed switch each other. This type of master switch for the non-contact type of new procts, simple structure, testing links between magnetic alone, without any mechanical contact, and there is no resistance card, work is very reliable.
Second, technical data
1, Model specifications (see table)
Relay Range
Contact number
Master Switch Model
2, contact capacity:
DC100W: Maximum of 220 V or A maximum of 0.5
AC200VA: Maximum of 220 V or A maximum 1
Third, installation and adjustment
1, the group will switch memory location in the shell firmly installed relay bracket.
2, on the attached map correctly install magnetic contact.
3, Indivial adjustment of the location of each memory switch, it will be convenient for the whole of the signal location. If not adjusted itinerary extreme position, stepped down can lead splint will be adjusted out of memory to switch some distance.

4, structure and installation plans
1, mounting holes
2, Magnetic Memory Switch
3, relay rack
4, Relay-pointer
5, relay rod
6, magnetic contacts
7, Model

⑦ 求英語高手幫我翻譯說明書,謝謝!

Multifunctional Pump Control Valve
1, uses
Installed in the pump outlet pipe Road, both electric valves, reversed water valves and water hammer eliminator three kinds of functions, effectively improve the safety and reliability of water supply, water supply engineering equipment in line with the requirements of mechanization and automation.
2, Features
1, eliminating water hammer and high reliability. Kai slowly closing devices, closed-chain movements are related to kick Edition; automatically closing speed, without the actual pump flow, head fluctuations, the calculation of time without closing speed; without professional and technical personnel on-site adjustment; without any electrical appliances, as well as hydraulic components, fewer failure points.
2, eliminating water hammer effect is good. Will be closed fast, slow to absorb water hammer device closure, as well as the elimination of three who is blowing the technical principles of integrated design, so that less water hammer pressure pump shut down to the lowest limit.
3, operation and easy maintenance. Just pump operation of the hoist motor starter button, the valve that the pump operating proceres in accordance with automatic opening and closing. The key parts are all made of high-quality materials, and basic maintenance-free.
4, energy-saving effect is good. Use of streamlined, body models and the latest patented technology design, and import similar procts, compared to rece the resistance loss of more than 50%.
4, the structure (Figure 1)
Multifunctional pump control valve is from the main valve and the appearance of annexes, the main valve from the valve body, diaphragm (piston-cylinder), stem component, the main valve plate, valve seat and other major components composed mainly controlled exterior accessories valves, filters, emptying valve, micro valve, which valve is specially designed micro-parts, in their only set back to the direction of flow of holes is limited.
2, manual operation of hoist
In pump operation, the first manual control patch connectivity control room (piston-cylinder) control valves and venting valve, so that the pressure P3 or P4 equal to zero, a one-way pressure diaphragm pressure plate or piston can check the valve plate open and close of . The valve is turned on, e to slow-closing valve plate up, the main water valve plates have been cast aside and the realization of open movements; valve is turned off, slow-closing valve plate promoting the valve plate closed.
6, installation considerations (Figure 4)
General Note:
1, the installation, be sure to check whether the various components of the main valve intact, solid pieces of complete, no loose.
2, check the connecting pipe intact, joint fastening.
3 ensure that the minimum pressure to meet the technical parameters required action.
4, the best way is to install the valve installed on the level of the main pipe, valve cover upward.
5 that if the main valve installed in the overcast wells should be prepared to stay a certain space for maintenance and technical personnel.
6, the installation, please note that outside the arrows indicate the direction of valve shall be anti-loaded.
7, such as to conct and observe the pressure regulator, pressure gauge shall be installed in the import and export side.
8, for the fire to start the inspection on a regular basis, to prevent the generation scale, resulting in valve failure.
Particular attention to matters:
1, installation, pay attention to check the cleaning pipes, without welding slag, bolts and other foreign matter.
2, pipe installation should be installed into the regulatory requirements relating to exhaust valves and other devices to ensure that disruption does not proce the water column.
3, valve imported paragraph shall be installed expansion joints flexible joints or pipes.
4, there are potential hazards of water hammer pumping station, pump shut down should be carried out calculation of water hammer.
7, commissioning steps
2, manual operation test:
(1) Kai pump key to whether the observation of the leaking valve import and export of pressure are normal.
(2) to open, the control valve (14) closed; emptying valve (15) closed, and then emptying valve (7) to open, then there is air or water discharge, indicating valve plates are open; valve plate to open in place, emptying valve (7) does not flow out, then the proof of justice is open; valve plate to open in place, emptying valve (7) does not flow out, then the proof of the piston-cylinder diaphragm intact; emptying valve (7) is still flowing out, then the membrane film damage.
(3) the valve manually shut down: The pipe on the bypass control valve (2), closed, control valve (14) open, exhaust valve (7), closed, and then emptying valve (15) open, then there is water discharges, slow-closing valve plate to promote the main valve plate closed; in the absence of water from the time that valve plate has been completely shut down. If the valve plate after the closure of emptying valve (15) is still flowing out, then we can see diaphragm seat (cylinder) and pass sets have been leaked (ie, pass bearing the "O"-rings have been damaged).
From the above two actions can be tested headstock stem movement is a reliable group of two. Tightness of the closure of valve plate check valve plate can be closed or observe whether there are water pipes sound meter.
3, stop pump slow closing time to adjust:
Closing time can be slow to stop pump by regulating the control valve on the bypass pipe (14) opening to regulate, should make fun of first control valve to extend the closing time delay. Into the slow closing time is too long, it will control valve (14) of the opening increases, or increasing the connecting pipe diameter; or slow closing time is too short, you can control valve (14) of the opening tune small.
If abnormal, please click Table 2 approach or directly with the company.

⑧ 自動化的安全裝置英語作文100

more families own private cars. Private cars, as the proct of modem civilization, have been playing a vital role in people's daily activities. First, private cars are a convenient means of transportation. You can go wherever you like. Secondly, there is no doubt that private cars will have a great impact on the economic growth. The rapid car instry growth will contribute much to keeping the country's economy growing at a higher rate in the near futrue. But every coin has two sides. The development of the private cars will bring about a series of problems

⑨ 自動化設備操作說明書怎麼做有借鑒的格式么

這個借鑒的文本太多太多了。你有賣數碼相機,有說明書,我的愛國者DC-60,是2005年賣的回,說明答書一大本,講得很詳細,而且是英漢雙語,所有操作步驟,附件使用,注意事項,常見問題處理,救助技術支持,等,內容豐富。
我們講這個愛國者數碼相機借來用說明書,也說明一本好的說明書,是要下功夫的,尤其是一些使用、維護的東西,不只是經驗的,而且是理論來指導的,那可是真知灼見,不是編寫者想當然,要反復推敲,也可以在使用一段時間後修訂。
說到這里,你已經知道,設備操作說明書,必備的大致內容,以及參考借鑒的東西了。
祝你順利成功!

閱讀全文

與自動化裝置英文說明書相關的資料

熱點內容
加油加氣防雷裝置多久檢測 瀏覽:475
閥門DJ41Y40P什麼意思 瀏覽:796
軸承如何加大承重 瀏覽:559
天正給排水系統圖怎麼畫閥門 瀏覽:264
暖氣片放完水回水閥門關還是開 瀏覽:428
暖氣進水閥門堵了什麼情況 瀏覽:106
鋼筋機械連接多少扣合格 瀏覽:131
機械密碼鎖如何打開右左右 瀏覽:36
管道天然氣要不要關閥門 瀏覽:984
用電腦怎麼解除設備鎖 瀏覽:619
晚幾點後怎麼調機械表日期 瀏覽:716
長安汽車儀表盤出現i是什麼 瀏覽:239
設備中電腦圖標感嘆號是什麼意思啊 瀏覽:861
超聲波流量表不熱怎麼回事 瀏覽:970
地鐵閥門卡怎麼拿 瀏覽:577
5400機械和固態差別多少 瀏覽:642
變電站計量裝置典型設計 瀏覽:268
睿馳cc儀表盤系統如何 瀏覽:491
機械表怎麼樣調整日期 瀏覽:628
鄭州最大的五金建材批發市場是哪個 瀏覽:274